Capacity Market Only
The Frequency Containment Reserve (FCR) is designed to manage minor imbalances in the system. Services are automatically offered by FCR providers as required.
FCR | |
---|---|
Capacity Market | Gate-Opening-Time: 11 o'clock, d-7, Gate-Closure-Time: 8 o'clock, d-1, Product length: 4 hours, 6 windows per day |
Energy Market | - |
Core Share | Core shares and cross border capacities are determined for the individual Load-Frequency Control blocks |
Minimum offer capacity | 1 MW |
Maximum offer capacity | 25 MW |
Pooling | Possible inside balancing area |
Indivisible offer | Indivisible offer possible |
Compensation | Capacity price |
Activation | Automatic activation |
Activation period | Full activation within 30 seconds |
Period to be covered per incident | 15 minutes |
Backup | Backup not possible |
Symmetrical/Asymmetrical | Symmetrical |
Deadband | ∆f = ±10 mHz: from 49.99 Hz to 50.01 Hz |